Skip to main content
Telematics

TELEMATICS

We’ll do anything to prevent downtime – night or day – with our telematics solution, Driverline.

Our agents will be prompted to call your drivers when their vehicle needs servicing, and stop the interruption before it starts. And because Driverline is a 24/7 service, it means we’re always on hand to step in, and make interventions that save you money.

FULL CONTROL

There’s more to what puts us ahead of the game. We provide drivers with a Bluetooth fob which allows them to confirm their identity, and whether they’re about to undertake a business or private journey – thus ensuring your data stays accurate and create a clear route to a more profitable fleet.

Person At Desk On Phone
Hazard Light Button Close Up

OUR TELEMATICS SOLUTION
PROVIDES:

  • Accident notifications
  • Detect impacts as low as five miles per hour.
  • Immediately check your driver is safe and uninjured, if a courtesy vehicle will be required, and reduce downtime.
  • Score drivers based on their driving style and behaviour, allowing you to educate on safety, fuel spend, and cutting CO2 emissions, tyre wear and insurance costs.
  • Easy installation
  • Our solution can simply be plugged into the car or van’s OBD port – zero downtime required.

PLUS...

  • 24/7 tracking
  • Save up to 25 per cent on wear and tear and 15 per cent on fuel bills with detailed cost reporting.
  • Optional geo-fencing
  • The geo-fence option means you can be alerted if vehicles are being used outside of prescribed hours or locations.
  • Fuel type analysis
  • Our Future Fleet Analysis tool provides recommendations based on which vehicles could be replaced with an EV or plug-in hybrid, and those best suited to petrol or diesel.
Full Fuel Tank
About Us

Sinclair Group is one of the UKs leading automotive retail groups, delivering exceptional vehicle sales, finance, and aftersales service across Wales and the West of England.

Cyber Essentials Plus certified and SAF (Specialist Automotive Finance) Approved badges

© 2026 Sinclair. All Rights Reserved. Sinclair Group is the brand name for all of our limited companies. Registered in England and Wales. Registered Address: Sinclair Group | Old Field Road | Bocam Park | Pencoed | CF35 5LJ. Registered number: 1192572.

Automotive website provided by Bluesky Interactive Ltd